0
2
Watch as SGL and TransProject collaborate to move seven HVDC units, each weighing over 865,000lbs. Beginning the journey in Sweden, these massive units traveled via rail, ship, barge, and trailer to their final destination in Oregon, USA. For two years the SGL / TransProject logistics staff engineered solutions to safely transport these valuable and sensitive units; including site surveys, load balancing schematics, and a custom barge discharge site. Watch the execution of the transport condensed down to only seven beautiful HD minutes.